28643 ha. sodic area out of which 14249 ha. barren area brought under green cover for the first time. |
|
|
445.58 km main drain remodeled and make functional. |
|
162.48 km drain-cum inspection path has also been contructed. |
|
913 km link drain constructed/rehabilitated. |
|
4157 new borings drilled and developed. |
|
total borings equipped with pumpsets 7075. |
|
Generation of additional irrigation potential 19428 ha. area through new borings. |
|
1362 ha. area brought under horticulture/inter-horticulture |
|
Regular crop-production with improved yields "paddy 30 qt/ha. and wheat 26 qt/ha." |
|
7075 WUG 's formed which are functional. |
|
1377 Women self help groups formed. |